Quincy Environmental Network
Home Events News Volunteer Links Government Organization
Wetlands Menu Second Marsh: 45 Acres
View Large Map

View Map

Second Marsh is in excellent condition and regarded as a very "healthy" marsh.

Problem: The bridge on Rhoda Street (southwest corner) has virtually no flow. This bridge and surrounding road surface have degraded to the extent that gravel and road debris began to collect in the creek on both sides of the bridge. As the creek-bed rose, it increased its ability to "catch" more and more material carried in the tidal flow. This combination of material quickly raised the creek-bed level high enough to choke off tidal flow. The loss of flow under this bridge results in both First and Second Marshes becoming backwaters or "dead-ends", leaving both Marshes with only one inlet, instead of two.

Proposed: Repair and upgrade of bridge and nearby road surfaces, including installation of catch basins. Dredge creek-bed under Rhoda Street to level equal to that of First and Second Marsh.

Proposed: Look at architectural improvements to both bridges. They should both be expansive giving the impression of a Seacoast or Nantucket style bridge. Right now, they are both utilitarian, and dull.


Top of Page
home |  events |  news |  links |  volunteer |  government |  organization