|
Third Marsh is a work in progress. The installation of four massive tide gates at the southwest corner near Rockland Street during a flood control program in the early 1990's, started this marsh on the road to recovery. The construction of a low "berm" around the western end also protects roads and property. Tidal flow under Rock Island Road was blocked during this project, however, adequate flow is provided through a tide gate and culvert from Edgewater Beach.
Proposed: Ask neighbors for input on possible overlooks or nesting sites.
|